In 2022, Thompson Construction completed phase 2 of the Wynnwood Estates located in Gretna, NE. The project was a water main installation compiling over 3,600 feet of 8” ductile iron pipe along with roughly 700 feet of 6” pipe, and 10 new fire hydrants installed.